Hi all, I am installing a 100mm topping in my house I am renovating. The existing substrate was the worst I've ever seen. I dug a hole in one part of the floor with my foot!!, Fiji quality building..
Can any one advise me on a correct way to finish the edges as the walls are up and i will not be able to use the Helicopter right up to the wall line, as you would a new build. I have seen some bad finishes with polished concrete that are in this same situation. The edge hand trowel work polishes a lot different than the bulk of the slab that has been passed with the helicopter. i am planning a cream polish

Any help would be much appreciated